MIGRATION AND MODERNIZATION
Website migration
and databases
Professional migration of websites, databases, and IT infrastructure to new servers, CMS, and hosting. MySQL/PostgreSQL database migration without data loss or downtime.
WEBSITE
DATABASES
INFRASTRUCTURE
MIGRATION
ADAPTATION
VERIFICATION
after migration
DATA
COMPATIBILITY
STABILITY
projects
of studio
models
Premier Partner status
marketing, analytics
We will migrate your website and database to a new server without risks or downtime
Moving to another host, changing CMS platform (replatforming), or database migration are critical operations for any online business. With an incorrect approach, there is a high risk of losing customer orders, stopping the site operation for several hours, or taking a critical drop in Yandex and Google search rankings due to link structure changes.
We perform seamless migration of high-load portals and distributed databases without downtime for business processes. Our methodology eliminates data loss. First, we deploy an exact copy of your project in a staging environment on the new server, conduct a full verification of cryptographic file checksums (SHA-256) and the number of entries in database tables, and only after final tests do we switch the traffic.
When updating PHP and DBMS we perform CMS modernization: we adapt legacy code, modules, and integrations to the new environment. For high-load projects with a continuous flow of orders, we configure real-time database replication, reducing technical downtime during DNS switching to almost zero.
- Website migration between hostings, VPS, and dedicated servers
- Database migration of any volume (MySQL, PostgreSQL, MongoDB, ClickHouse)
- CMS platform change with full import of products, clients, and orders
- Preserving the website's SEO structure and setting up 301 redirects
- Migration of corporate email without loss of email archive and DNS configuration
100%
Data integrity guarantee through full SHA-256 and DB row verification
<15 min
Maximum downtime during standard domain DNS record switching
0
SEO position loss avoided thanks to preserving URLs and a 301 redirect map
7 days
Monitoring and project support at the new location after the migration is complete
How we preserve customer transactions
In online stores, orders are placed every minute. We do not migrate the database live. We switch the site to maintenance mode (Read-Only) for 5 minutes, perform a final differential database migration, and instantly switch gateways, eliminating missed payments.
Three golden rules secure migration
We do not rely on luck; we use proven checklists and automated scripts.
Mandatory Staging environment
We never upload files directly to the production server. First, a test copy (Staging) is deployed on a new server. We verify the correct operation of all scripts, page loading speed, email dispatch, and integrations.
And only after you personally check the Staging site, we plan the live migration.
SEO position protection and 301 redirects
Changing CMS almost always leads to a change in page URLs. To prevent Yandex and Google crawlers from throwing 404 errors, we draw up a complete redirect map. Each old link redirects to a new equivalent.
Search page equity is transferred to the new system, eliminating organic traffic drops.
Preliminary DNS preparation
DNS server updates at providers can take up to 24 hours. To make the switch instantaneous, 2 days before migration we lower the TTL (Time to Live) value of your domain records to 300 seconds.
After switching the domain, providers will update the IP address in 5 minutes, minimizing downtime.
How is it going project migration
Step-by-step migration workflow from backup creation to domain switching.
Backup and audit
We create full archive copies of files and database dumps. We analyze the configuration of the current web server (PHP, modules, software versions) and the new server.
Staging deployment
We import files and database to the new server under a test technical domain. We configure the environment and test project functionality.
Writing migration scripts
When switching CMS, we write custom SQL and PHP scripts to transform the database: we migrate users while preserving password hashes, catalogs, and order history.
TTL reduction and preparation
We reduce the caching time of the domain's DNS records. Configure SSL certificates on the new server in advance so that the website opens via HTTPS immediately after the migration.
Final production migration
We switch the old website to Read-Only mode. We migrate data accumulated during testing, verify table and file checksums, and switch the domain IP.
Post-migration audit
We check form submissions, payment processing, cron jobs. We scan the site for broken links and 404 errors. We monitor load on the new server for 7 days.
Tools data migration
We use high-performance console utilities for fast transfer of terabytes of data.
rsync & SSH compression
Professional file synchronization utilities. Allow transferring gigabytes of images via compressed streams over an encrypted SSH channel, downloading only changed files.
MySQL / PostgreSQL replication
Database replication mechanisms. Used for on-the-fly transaction mirroring, allowing the new server to have an up-to-date DB copy down to the millisecond.
DNS BIND & Cloudflare API
Domain name management systems. They allow quick management of resource records (A, CNAME, MX, TXT) and configuration of CDN proxying for security and speed.
— COST
Pricing project migration
The price depends on the volume of data, CMS compatibility with the new software, and the complexity of the migration.
| Features | Hosting migration Website migration from old hosting to another VPS/VDS 15 000 ₽ Timeframe: up to 3 days Order | Popular Migration and modernization Site, DB, and infrastructure migration with CMS adaptation for modern software 55 000 ₽ Timeframe: up to 7 days Order | CMS Replatforming Full website migration with CMS change while preserving SEO from 110 000 ₽ Timeframe: from 14 days Discuss |
|---|---|---|---|
CMS and modern software compatibility |
— | ✓ Adaptation to current PHP and DBMS, fixing incompatible code | ✓ Data and integration migration to a new CMS |
Volume of transferred files and DB |
up to 50 GB files, up to 5 GB DB | up to 500 GB files, up to 50 GB DB | Unlimited data volume |
Integrity check (SHA-256 hash) |
✓ Basic folder check | ✓ File-by-file verification | ✓ File-by-file verification + table audit |
Fault-tolerant replication (Master-Slave) |
— | Optional per project | ✓ Seamless real-time database synchronization |
Preserving SEO structure and redirects |
✓ Migration of current .htaccess / Nginx | ✓ Redirects Setup | ✓ Creating and implementing a 301 redirect map |
Mailbox migration |
— | up to 10 mailboxes with email archive | Unlimited with DKIM/SPF/DMARC configuration |
Warranty support period |
7 days | 14 days | 30 days with rapid response |
— QUESTIONS AND ANSWERS
FAQ about website migration
Afraid of losing clients due to website downtime? Write to us — we will plan the migration for nighttime minimum user activity and execute it seamlessly.
Ask a question-
Will the website be unavailable during migration to another hosting?
No, while preparing the site for migration, it remains fully accessible to your visitors at the old address. We deploy a copy of the project on the new server, debug it, test it, and only redirect the domain after complete readiness. For some time (while DNS servers are updating at internet providers), some users will reach the old server and some the new one. Both servers will run in parallel, eliminating downtime. -
How to maintain search engine rankings when migrating to a new CMS?
Changing a CMS system often involves changing internal page addresses (URLs). If a Yandex or Google crawler visits an old address and sees a 404 error (page not found), the page's position in search results will reset. To prevent this, we parse all indexed site links, create an "old URL — new URL" mapping table, and set up 301 Redirect rules on the new server. The crawler follows the old link, is instantly redirected to the new page, and merges them in the index without losing positions. -
How do you guarantee that buyer or order data won't be lost?
First, before starting any work, we create a full archive of files and a database dump, and download them to a local secure disk. Second, after the migration, we run automated verification scripts: we compare the SHA-256 checksums of all migrated files and count the exact number of rows in each database table (users, orders, products, transactions). Third, we do not disconnect the old server for at least 7 days after the move, so that in case of force majeure, we always have access to the original operational data. -
How long does domain DNS propagation take?
DNS update time depends on your visitor's Internet service provider and domain zone settings (TTL). Typically, this process takes from 2 to 24 hours. To speed up the switch, two days before migration, we reduce the TTL parameter to the minimum possible (usually 5 minutes). In this case, providers will request the current server IP address much more frequently, and switching to the new server for 99% of users will happen almost instantly right after changing domain settings.